Get in touch with Cenwan Machine Company

Contact Form 使用中

Workshop Footprint Planner — Cenwan Dual-Channel Line

Workshop Footprint Planner — Cenwan Dual-Channel Line

Visualize the workshop bay needed to install the Cenwan dual-channel integrated line. Includes line dimensions, upstream paper-stack staging, downstream pallet area, and recommended service walkways.

Your workshop bay

Cenwan recommends ≥22 m
Cenwan recommends ≥6 m
Line height 1.8 m + service clearance ≥0.7 m
2 m typical for one-shift paper stock
2 m typical for outgoing pallet staging
≥0.8 m required for safe operator access

Required vs Available

Line dimensions (fixed) 17.5 × 4 × 1.8 m
Required bay length
Required bay width
Required clearance
Total floor area needed
Paper Service walkway Cenwan Dual-Channel Line 17.5 × 4 m, height 1.8 m Service walkway Pallet
Line (17.5×4 m)
Paper staging
Pallet area
Service walkway
How this checks fit: Required length = 17.5 m line + paper staging + pallet area. Required width = 4 m line + (2 × walkway). Required clearance = 1.8 m line + 0.7 m service margin = 2.5 m minimum. The visualization scales to your inputs; if any dimension fails, the bay is undersized for the integrated line and additional preparation work is required. Cenwan releases a precise installation drawing with each quote based on your bay measurements.